Stop Burning Your Cash and Switch Today!
The Steps of Switching to Solar
-
Take It Easy
You relax on your throne, while we take care of the rest.
-
Site Survey
An expert technician will visit your home to measure and review the roof, check the electrical panel, and take all necessary pictures to ensure engineering can go as efficiently as possible.
-
Engineering
Our engineering team will take the information, measurements and pictures from the site survey and create a set of engineered plans that will be used for permitting and installation.
-
Permitting
We handle all administrative work necessary to be approved for your installation. Depending on your jurisdiction, utility or HOA, we may need additional signatures after engineering for us to receive the required approvals.
-
Installation
Once we receive all required approvals, it is time for installation day! Our scheduling department will reach out and schedule the installation date and arrival time with you to make sure you can be there, if requested, but not necessary.
-
City Inspection
Most installations take just one day; however, depending on your system size, it can be a few days. Once the installation is completed, our team will schedule an inspection with the local jurisdiction.
-
Utility Hook-Up
Once the inspection is completed and approved, we will submit all necessary paperwork to your utility provider for them to complete their own inspection. Most utilities take anywhere from 2-4 weeks to complete their inspection.
-
Power On
PTO DAY! After your utility provider has completed their inspection and given Permission to Operate, you are able to turn your system on. Now, you will be able to monitor your system via your phone and watch all your savings pile up from your choice to go solar.